Project Cases

Project references across Uzbekistan, Ethiopia, the United States and Norway for ASIC and blockchain computing infrastructure, including modular and high-density liquid-cooled container deployments from 1.7 MW to 36 MW. Capacity and performance details are included only where disclosed in the September 10, 2026 corporate presentation.

5+Casos verificados
4Países y regiones
5Sectores de aplicación
Not disclosedEntrega a tiempo

Historias de éxito de clientes

Filtre por industria, mercado o tipo de producto para encontrar una implementación comparable.

5 casos mostrados
ET
High-density liquid-cooled container infrastructure for blockchain computing in Ethiopia.Producto

Blockchain computing infrastructure buyer (BITMAIN, Ethiopia)

Listed in the September 10, 2026 corporate presentation as a BITMAIN 21.12 MW high-density liquid-cooled container project in Ethiopia, with a project photograph. Operating duration and measured efficiency results are not disclosed.

21.12 MW high-density liquid-cooled container projectQuantity
2 yearsDuration
US
Modular container infrastructure for blockchain computing in Ohio, USA.Producto

Modular blockchain computing project buyer (BITMAIN, Ohio, USA)

The September 10, 2026 corporate presentation lists a BITMAIN 1.7 MW modular container project in Ohio and includes a project photograph. Operating duration and measured performance results are not disclosed.

1.7 MW modular container projectQuantity
2 yearsDuration
NO
Containerized liquid-cooling infrastructure for blockchain computing in Norway.Producto

ASIC computing equipment company (Canaan, Norway)

Featured in the company's September 10, 2026 corporate presentation as a 30 MW liquid-cooled container project in Norway for Canaan. The presentation includes a project photograph. Operating duration and measured efficiency data are not disclosed.

30 MW liquid-cooled container projectQuantity
3 yearsDuration
US
Containerized liquid-cooling infrastructure for high-density blockchain computing equipmentProducto

ASIC computing equipment company (MicroBT, Texas, USA)

The September 10, 2026 company presentation lists a MicroBT 36 MW liquid-cooled container project in Texas, USA, with a project photograph. It demonstrates liquid-cooling integration and overseas delivery experience. Operating duration, measured PUE, water savings and energy savings are not disclosed.

36 MW liquid-cooled container project, as disclosed in the company presentationQuantity
3 yearsDuration
No hay casos coincidentes. Intente cambiar los filtros.

¿Tiene un proyecto similar?

Comparta las condiciones de su sitio, dimensiones requeridas y aplicación. Nuestro equipo de ingeniería recomendará una solución comparable.

Caso de proyecto