🌍 Winley Electric Desde 2014 ⭐ 12+ Año Experiencia en la industria ✓ Proveedor de élite verificado
✓ Proveedor de élite verificado
menú
Verified Project Evidence

Project Cases

Explore our verified project cases showcasing reliable transformer solutions for utility-scale BESS, grid modernization, renewable energy, and industrial power applications across the US and Honduras.

8+Casos verificados
2Países y regiones
8Sectores de aplicación
100%Entrega a tiempo

Historias de éxito de clientes

Filtre por industria, mercado o tipo de producto para encontrar una implementación comparable.

8 casos mostrados
US
High-voltage power transformation for utility substations, regional grid expansion, and large industrial power systems. The 230/34.5/13.8kV three-winding configuration supports 34.5kV distribution networks and project-specific tertiary winding requirements. Suitable for substation capacity upgrades, main transformer replacement, and applications with changing power demand.Producto

Utility Companies, Substation EPC Contractors, Industrial Power Developers

The 100/133/167MVA staged cooling design offers flexible capacity to accommodate changing electricity demand while supporting efficient operation under different load conditions. Integrated temperature and pressure monitoring helps operators supervise transformer conditions, while detachable radiators with isolation valves simplify maintenance planning. The customized three-winding configuration supports integration into high-voltage substation projects and long-term power infrastructure development.

1 unitQuantity
30 yearsDuration
US
Designed for large industrial substations requiring multiple 2.4 kV and 4.16 kV secondary feeders for medium-voltage motors and process loads.Producto

EPC

1. Two 10–14 MVA custom substation transformers were manufactured within a 9-week production cycle. 2. Dd0y1y1 winding configuration with multiple 2.4 kV and 4.16 kV secondary outputs for industrial medium-voltage distribution. 3. One transformer platform supports multiple medium-voltage distribution buses and industrial loads..

2Quantity
30 yearsDuration
US
utility scale solar farm, battery energy storage system, hybrid renewable energy plant, pv storage co-located substation, grid-scale solar energy storage projectProducto

Renewable Energy Developer

smooth PV storage grid connection, stable 34.5kV voltage output transformer, reliable renewable energy grid interconnection, seamless solar storage power dispatch

1 unit, 8 MVAQuantity
30 yearsDuration
US
Industrial Park, Data CenterProducto

Electrical Contractors

Winley Electric has successfully completed production of two 34 MVA Substation Power Transformers. Engineered for utility and industrial power applications, these high-capacity transformers adhere strictly to ANSI/IEEE standards for North American markets. Equipped with a 304 stainless steel structure and NEMA 4X weatherproof enclosure, they deliver outstanding protection against harsh outdoor conditions, and the whole production was accomplished within just 12 weeks.

2 unitsQuantity
30 yearsDuration
HN
This 6500kVA oil-immersed step-up transformer is mainly applied to the supporting step-up substation of large-scale ground-mounted solar power plants in Honduras. It steps up the low-voltage power collected by photovoltaic modules to the grid-compatible voltage to realize safe and stable grid connection and transmission of clean energy, optimize power quality, adapt to local grid operation specifications, and ensure long-term reliable operation of the entire solar power system.Producto

Energy Enterprise

1.Achieved ultra-fast delivery in 7 weeks, 5–9 weeks shorter than the industry average of 12–16 weeks, improving efficiency by over 40%. 2.Supplies about 10MW clean power to southern Honduras, alleviating power shortage and promoting energy transition. 3.Low loss, high reliability, long-term stable operation, reducing operation cost of the power station.

2 unitsQuantity
20 yearsDuration
US
1. Large Commercial & Retail Complexes 2. Data Centers (Edge & Mid-Scale) 3. Industrial Manufacturing & Logistics 4. Renewable Energy & EV Infrastructure 5. Multi-Family Residential & MicrogridsProducto

Electricity Utility Company

Winley Electric successfully completed the production of 31 units of three-phase pad mounted transformers for a North American client, covering two core specifications: 2550kVA and 3750kVA, with high-voltage ratings of 34.5kV and 12.87kV. This batch production, completed efficiently within the agreed timeframe, fully demonstrates Winley Electric’s strong mass production capacity and high production efficiency—we can simultaneously handle the production of multiple specifications of transformers in large quantities, strictly control production cycles, and ensure on-time delivery without compromising quality. It is worth noting that Winley Electric’s entire series of three-phase pad mounted transformers have obtained UL and CUL certifications, fully complying with North American safety and quality standards. The entire production process of these 31 units was carried out in strict accordance with the client’s actual application scenarios and North American industry standards, solving the client’s key concerns in procurement and delivering a reliable power distribution solution that meets their on-site needs.

31 unitsQuantity
20Duration
US
Grid Modernization and Renovation of Aging SubstationsProducto

Utility Company

Across North America, aging grid infrastructure, surging municipal power demand, renewable energy interconnection and regional load expansion have created severe supply shortages for large-capacity substation power transformers. Local North American manufacturers face extreme production backlogs, with lead times for 30–50 MVA liquid-filled substation transformers often extending beyond 100 weeks. These prolonged lead times cause widespread project delays, construction holdups and urgent equipment gaps for U.S. utility and grid upgrade clients. To address these pain points for a U.S. utility client, Winley Electric delivered two 40 MVA conservator-type liquid-filled step-down substation power transformers, focusing on fast delivery, reliable performance, and tailored logistics support.​The entire in-house production and testing cycle was completed in 12 weeks, effectively solving the client’s urgent need to avoid project delays. ​

2 unitsQuantity
30Duration
No hay casos coincidentes. Intente cambiar los filtros.

¿Tiene un proyecto similar?

Comparta las condiciones de su sitio, dimensiones requeridas y aplicación. Nuestro equipo de ingeniería recomendará una solución comparable.

Caso de proyecto