Proyecto destacado · AE,AT,AU,BE,BR,CA,CH,CL,DE,DK,ES,FI,FR,GB,HU,IE,ID,IT,JP,KR,MX,MY,NL,NO,NZ,PH,PL,PT,QA,RU,SA,SG,SE,U HVAC / Shell & Tube Heat Exchanger
Tube-to-tube sheet orbital welds for industrial shell-and-tube heat exchangers used in HVAC systems
AE,AT,AU,BE,BR,CA,CH,CL,DE,DK,ES,FI,FR,GB,HU,IE,ID,IT,JP,KR,MX,MY,NL,NO,NZ,PH,PL,PT,QA,RU,SA,SG,SE,U
Producto
HVAC / Shell & Tube Heat Exchanger
ASME U-stamp certified | 100% helium leak test pass | Units shipped to 6 countries
USD 20K-50K | 4 units (TB-65 Series, XD-U Series) Cantidad
2 years Duración
— —
Ver caso completo
Solicitar solución similar
AE,AR,AU,BE,CA,CH,CL,DE,DK,ES,FI,FR,GB,HU,ID,IE,IT,JP,KR,MX,NL,NO,NZ,PE,PH,PK,PL,PT,QA,RU,SA,SE,SG,T
SS316L medical oxygen, medical air, and vacuum piping for 400-bed general hospital Producto
Hospital / Medical Gas System
HTM 02-01 / NFPA 99 compliant | 100% leak test pass | Hospital commissioned on schedule
USD 15K-35K | 2 units (XD-20PRO Medical Spec) Quantity
4 year Duration
AE,AR,AT,AU,BE,BR,CA,CH,CL,DE,DK,ES,FI,FR,GB,IE,IT,KR,MX,MY,NL,NO,NZ,PE,PH,PK,PL,PT,QA,RU,SA,SE,TH,T
Boiler water wall tube-to-tube sheet welds and superheater tube replacement in 300MW thermal plant Producto
Power Generation — Boiler Tube Replacement
ASME Section IX qualified welds | 100% UT pass rate | Plant reconnection 4 days ahead of schedule
USD 25K-55K | 3 units (XD-TB35 Series, XD-GH Series) Quantity
2 years Duration
AE,AR,AT,AU,BE,BR,CA,CH,CL,DE,DK,ES,FI,FR,GB,HU,IE,IT,JP,KR,MX,MY,NL,NZ,PH,PK,PL,PT,QA,RU,SA,SE,SG,U
SS316L and Duplex SS process piping for acid transfer and solvent recovery systems Producto
Chemical / Petrochemical — Acid Transfer Piping
Zero leak incidents | API 582 welding requirements met | Client repeat order placed
USD 18K-40K | 5 units (XD-20W, XD-40) Quantity
3 year Duration
AE,AT,AU,BE,CA,CH,CL,CZ,DE,DK,ES,FI,FR,GB,HU,ID,IE,IT,JP,KR,MX,NL,NO,NZ,PE,PH,PK,PL,PT,QA,RO,RS,RU,S
SS316L large-bore pipe girth welds Producto
Water Treatment / Seawater Desalination
All welds passed ASME B31.3 pressure test | Zero rework on 400+ girth welds | Project delivered 2 weeks early
USD 25K-55K | 2 units (XD-GH Series, XD-K Series) Quantity
4 year Duration
AE,AT,AU,BE,BR,CA,CH,CL,DE,CZ,DK,ES,FI,FR,GB,HU,ID,IE,IT,MX,MY,NL,NO,NZ,PE,PH,PL,PK,PT,QA,RU,SA,SE,S
Ultra-pure gas (UPG) distribution and DI water loop piping in 28nm process semiconductor fab Producto
Semiconductor / UPG Distribution Piping
SEMI F57 cleanliness standard met | Zero particle exceedance events | FAB production uninterrupted
USD 60K-130K | 4 units (XD-20PRO Hi-Purity + tube-sheet heads) Quantity
1 years Duration
AE,AR,AT,BR,CA,CH,CL,CZ,DE,DK,ES,FI,FR,GB,HU,ID,IE,IT,JP,KR,MX,NO,NL,NZ,PE,PH,PL,PT,QA,RU,SA,SE,SG,T
SS304L sanitary piping for UHT milk processing and pasteurization lines Producto
Food & Beverage / Dairy Sanitary Pipeline
3A Sanitary Standard certified | Zero contamination incidents | 100% pressure test pass
USD 18K-45K | 2 units (XD-20PRO + accessories) Quantity
1.5 years Duration
AE,AT,AU,BE,BR,CA,CH,CL,ES,FI,FR,IE,ID,HU,IT,KR,MX,MY,NL,NO,NZ,PH,PK,PL,PT,QA,RU,SE,SG,US
SS316L WFI (Water for Injection) piping, CIP/SIP pipeline for sterile production Producto
Pharmaceutical / WFI Pure Water System
Zero weld defects | EU GMP audit passed (first attempt) | All weld records documented
EUR 50K-100K | 3 units (XD-20PRO + weld heads) Quantity
3.5 years Duration
No hay casos coincidentes. Intente cambiar los filtros.