🌍 CHENGLEI Desde 2016 ⭐ 10+ Año Experiencia en la industria ✓ Proveedor de élite verificado
✓ Proveedor de élite verificado
menú
Verified by field-proven results in harsh conditions.

Project Cases

Explore our successful case studies across various industries and regions, demonstrating high reliability and innovation in demanding environments.

3+Casos verificados
3Países y regiones
3Sectores de aplicación
100%Entrega a tiempo

Historias de éxito de clientes

Filtre por industria, mercado o tipo de producto para encontrar una implementación comparable.

3 casos mostrados
RU
For remote automated control of local oil and gas pipelines and energy infrastructure in Russia, it is necessary to cope with the extremely cold climate, large temperature differences, and potentially explosive gas environments.Producto

Strategic Partner of Russia (in the fields of oil/natural gas and energy infrastructure)

The first batch of over 400 high-end intelligent electric actuators successfully passed the factory acceptance test (FAT) conducted by the Russian delegation, with product stability and intelligence levels far exceeding expectations. This marks a breakthrough for "China's intelligent manufacturing" in the high-end Russian market, successfully replacing some traditional European and American brands.

400 setQuantity
4 yearsDuration
US
It is applied to the automatic control of valves in core sections such as raw material grinding, high-temperature digestion, sedimentation separation, and evaporation stations. The on-site environment is harsh, accompanied by strong vibration, high temperature, and dust, resulting in a high failure rate of existing equipment.Producto

Large non-ferrous metal group

The successful deployment of nearly a thousand intelligent actuators has ensured the uninterrupted operation of the production line 24/7. It has addressed safety hazards arising from high-altitude operations and strong vibrations, achieved Profinet industrial Ethernet communication interconnection across the entire factory area, and helped the factory become a benchmark project for intelligence with the "largest single scale globally".

200 setQuantity
6 yearsDuration
No hay casos coincidentes. Intente cambiar los filtros.

¿Tiene un proyecto similar?

Comparta las condiciones de su sitio, dimensiones requeridas y aplicación. Nuestro equipo de ingeniería recomendará una solución comparable.

Caso de proyecto